Past topics¶
2021¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-206 |
Re-commissioning of Injection Protection System and LBDS | lbdslhc-injection |
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-187 |
TL steering with full train and bunch intensity interlock for LBDS intercepting devices | lhc-injectionlbds |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-143 |
Injection Protection: Summary of changes and re-commissioning after EYETS | lhc-injection |
2015¶
Reference | Title | Tags | Links |
---|---|---|---|
Workshop | Injection System | lhc-injection | |
MPP-106 |
Injection summary of commissioning results | lhc-injection |
2014¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-97 |
Re-commissioning procedures for the injection protection system | lhc-injection |
2013¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-79 |
TDI gap measurement – options and resources needed | lhc-injection | |
MPP-79 |
Proposal for BETS interlocking for MSI, TDI and TCDQ | lhc-injectionlbds | |
MPP-78 |
TCDI / virtual beta* interlocking | lhc-injection |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-67 |
Conclusions after TDI issue in Pt8 and Reminder on MKI and MKE interlock depending on TDI position as preparation for 25ns scrubbing run | lhc-injection | |
MPP-65 |
Issue with timing synchronization SPS/LHC – TDI impact | spslhc-injection | |
MPP-60 |
LHCb observations during injection kicker (MKI-D) field breakdown | lhc-injection | |
MPP-60 |
TDI Interlocks | lhc-injection | |
MPP-60 |
TDI Observations | lhc-injection | |
MPP-58 |
Load on Q6 in case of injection failure and primary beam impacting on the TCLIB | lhc-injection |
2011¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-52 |
Injection losses vs Operational Availability | lhc-injection | |
MPP-48 |
Losses during recent injection events – observations and risk for ALICE detector | lhc-injection | |
MPP-44 |
Quench analysis of TDI grazing event on 18-04-2011 | quench-testlhc-injection |
2010¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-37 |
ABT re-commissioning and changes for 2011 | lhc-injectionlbds | |
MPP-25 |
status of LIBD | lhc-injectionlbds | |
MPP-22 |
External presentation (LBDS/Injection meeting): |
lbdslhc-injection |
2009¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-19 |
TDI issues | lhc-injection | |
MPP-18 |
Injection protection setup during injection test | lhc-injection | |
MPP-11 |
MKI test mode | lhc-injection |
2008¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | LHC Injection kicker MKI "mini-conditioning" | lhc-injection |
2001¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Injection into the LHC - how to avoid the UA2 experience (R. Schmidt) |
lhc-injectionlhc-experiment | |
MPWG | Energy information and septa surveillance - Report from a sub-WG meeting | lbdslhc-injection |