Skip to content

Past topics

2022

Reference Title Tags Links
MPP-227
Experience of Linac4 source test and proposal for 2023 source operation
(A. Lombardi)
linac4
MPP-227
Risk assessment for change of Linac4 source BIC actuator
(J. Lallement)
linac4bis

2021

Reference Title Tags Links
MPP-218
Operational experience of Continuous Caesiation at Linac4
(J. Lallement)
linac4
MPP-215
Machine-protection implications of Linac4 source tests
(A. Lombardi)
linac4
MPP-213
Experience with the Linac4 RFQ breakdown protection and automatic recovery system
(R. Wegner)
linac4
MPP-213
Protection of the Linac4 LEBT settings
(R. Scrivens)
linac4

2020

Reference Title Tags Links
MPP-200
Data processing and measurements
(M. Saccani)
pspsblinac4
MPP-200
Overview and architecture
(C. Zamantzas)
pspsblinac4
MPP-200
Commissioning status
(D. Medina Godoy, M. Saccani)
pspsblinac4
MPP-200
Software and controls
(D. Medina Godoy)
pspsblinac4
MPP-200
Acquisition principle
(E. Calvo Giraldo)
pspsblinac4
MPP-200
Systems deployment
(W. Vigano')
pspsblinac4
MPP-189
Critical settings management for Linac4 and PSB
(B. Mikulec)
linac4psb
MPP-188
Interlocking and SIS implementation of Linac4 LEBT settings
(T. Bukovics)
linac4
MPP-188
Management and protection of Linac4 LEBT settings
(R. Scrivens)
linac4
MPP-188
Strategy for RF breakdown protection of the Linac4 RFQ
(R. Wegner)
linac4
MPP-188
Findings on Linac4 RFQ vane damage and proposed mitigation strategies
(R. Scrivens)
linac4
MPP-188
Software implementation for RF breakdown protection and recovery
(B. Bielawski)
linac4

2019

Reference Title Tags Links
MPP-184
Follow-up actions on continuous caesiation for LINAC4 & recent experiences
(M. O'Neil)
linac4
MPP-184
Recent PSB radiation alarm during LINAC4 LBE run: post-mortem analysis and actions
(D. Nisbet)
psblinac4
MPP-180
Conclusions and wrap-up
(J. Uythoven)
linac4
MPP-180
Test Stand Results
(E. Mahner)
linac4
MPP-180
Technical implementation and risk mitigation
(M. O'Neil)
linac4
MPP-180
Risk assessment for the RFQ
(S. Ramberger)
linac4
MPP-180
Description of technical implementation by other labs
(E. Mahner)
linac4
MPP-180
Introduction to continuous Cesiation
(A. Lombardi)
linac4
MPP-180
Aim and context of meeting
(D. Nisbet)
linac4
MPP-179
Management of Critical Settings for LINAC4
(A. Lombardi, B. Mikulec)
linac4
MPP-178
LINAC4 and LBE Line Run related topics
(B. Mikulec)
linac4

2016

Reference Title Tags Links
MPP-133
AOB - Interlock logic for the laser and diamond detectors in Linac4
(T. Hofmann)
linac4
MPP-132
L4 Vacuum system: Status and interlock logic - J. Hansen / J. De La Gama
(J. De La Gama Serrano)
linac4
Watch dogs: Configurations and interlock logic
(J. Allica Santamaria)
linac4
Linac 4 source: Status and interlock logic
(M. O'Neil)
linac4
160MeV commissioning and reliability run plans
(A. Lombardi)
linac4
Welcome and goals of review
(D. Nisbet, M. Zerlauth)
linac4
Half-sector test: Planning, objectives and operations
(B. Mikulec)
linac4
Machine Protection configuration for 160MeV
(A. Apollonio)
linac4
Pre-Chopper: Status and interlock logic
(N. Voumard, T. Gharsa)
linac4
Chopper: Status and interlock logic
(G. Hagmann)
linac4
L4 Power converters and switching magnet acquisition cards: Configurations and interlock logic
(D. Nisbet)
linac4
Beam Loss Monitors and Diamond detectors: Configurations and interlock logic
(C. Zamantzas, F. Roncarolo)
linac4
L4 RF system: Status and interlock logic
(D. Glenat)
linac4
MPP-123
Linac 4 commissioning with 100MeV MPS aspects
(A. Apollonio, D. Nisbet)
linac4

2015

Reference Title Tags Links
MPP-117
Linac4 commissioning, experience, status and strategy
(D. Nisbet)
linac4
MPP-111
Proposed changes in Chopper Master BIC for 50MeV commissioning
(S. Gabourin)
bislinac4
MPP-111
Machine Protection considerations for 50MeV commissioning & Reminder on two Linac4 incidents
(A. Apollonio)
linac4

2014

Reference Title Tags Links
MPP-89
MPP considerations for 12MeV commissioning
(A. Apollonio)
linac4
MPP-89
Operational experience with BIS system in LINAC4 and open issues/non-conformities
(C. Martin)
linac4bis
MPP-89
Operational experience with interlock systems during initial 3MeV commissioning phase
(A. Lombardi)
linac4

2013

Reference Title Tags Links
MPP-80
Machine Protection Considerations to Linac4 BIS commissioning
(A. Apollonio)
bislinac4

2012

Reference Title Tags Links
MPP-66
Risk assessment in the next injector complex
(A. Apollonio)
linac4
MPP-66
Beam Interlock System for Linac4, Transfer Lines and Ps Booster.
(B. Puccio)
linac4
MPP-66
Short Introduction to Linac4
(B. Mikulec)
linac4