Skip to content

Past topics

2023

Reference Title Tags Links
MPP-235
MD with high intensity beam for the PSB
(F. Asvesta, G. Di Giovanni)
psb

2021

Reference Title Tags Links
MPP-218
Beam dump matrix modifications of the WIC in the PSB and PSB extraction lines
(G. Di Giovanni)
psb
MPP-208
Major Event Report on PSB extraction
(B. Mikulec, G. Di Giovanni)
psb

2020

Reference Title Tags Links
MPP-200
Data processing and measurements
(M. Saccani)
pspsblinac4
MPP-200
Overview and architecture
(C. Zamantzas)
pspsblinac4
MPP-200
Commissioning status
(D. Medina Godoy, M. Saccani)
pspsblinac4
MPP-200
Software and controls
(D. Medina Godoy)
pspsblinac4
MPP-200
Acquisition principle
(E. Calvo Giraldo)
pspsblinac4
MPP-200
Systems deployment
(W. Vigano')
pspsblinac4
MPP-194
PSB commissioning procedure for injection of the Linac4 H- beam without stripping foil
(B. Mikulec)
psb
MPP-194
PSB operation procedure for injection into less than 4 rings
(B. Mikulec)
psb
MPP-189
Critical settings management for Linac4 and PSB
(B. Mikulec)
linac4psb

2019

Reference Title Tags Links
MPP-184
Recent PSB radiation alarm during LINAC4 LBE run: post-mortem analysis and actions
(D. Nisbet)
psblinac4
MPP-182
PSB: Injection into less than 4 rings
(B. Mikulec)
psb