Past topics¶
2016¶
2014¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-96 |
Beam dumps following trips of EXP magnets - MSS hardware upgrade | qps |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-64 |
Pspice analysis and follow-up of converter trip of RTQX2.L2 | qps |
2009¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-12 |
Plans and status of busbar quench simulations | qps | |
MPP-12 |
Enthalpy margins and quench levels for the RB/RQ bus | qps |
2005¶
2004¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Quench detection and its time constants | fast-failureqps | |
MPWG | Quench mechanisms and their time constants | fast-failureqps |
2001¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Interface between quench protection and power interlock systems (R. Denz) |
qpspic | |
MPWG | Plannings & schedules for critical interfaces - Quench protection system | qps |