Past topics¶
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-240 |
New BCT5 Connection to the SPS-SMP and Implications for the YETS 2023-24 | smp |
2022¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-231 |
SMP modifications and their implications during YETS 2022-2023 | smp |
2019¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-181 |
New beta* reconstruction for run3 | smp | |
SMP v2 Hardware Implementation and Timeline | smp | ||
LS3 Plans for the Timing System and beyond | smp | ||
Feedback from SPS Operation | smp | ||
Feedback from LHC Operation | smp | ||
Overview of the present SMP System | smp | ||
BI connections to SMP | smp |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-142 |
SMP: Summary of changes and re-commissioning after EYETS | lhc-revalidationsmp |
2016¶
2015¶
2014¶
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-61 |
SMP (cross-checker): Diagnostics and Pre-Post Operational checks | smp | |
MPP-61 |
Implementation and first experience with SMP cross-checker | smp |
2011¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-53 |
SMP<->GMT transmission cross-check | smp | |
MPP-46 |
Beam Presence Flag Changes- TS#3 | smp | |
MPP-40 |
SMP 3v0 | smp |
2010¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-36 |
SMP re-commissioning for 2011 | smp | |
MPP-33 |
Proposal for SBF | smp | |
MPP-26 |
Beam Presence Flag filter (B. Todd) |
smp | |
MPP-25 |
SMP beam flag 1A event | smp | |
MPP-23 |
SMP status and plans (B. Todd) |
smp |
2009¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-19 |
SMP issues | smp | |
MPP-16 |
Flexible energy windows for SMP | smp |
2008¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-2 |
SMP update | smp | |
MPWG | From SPS to LHC: Flags | smp |
2007¶
2005¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Generation and Transmission of Safe Beam Parameters | smp |