Past topics¶
2021¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-208 |
Update on SPS crystal interlocking | sps | |
MPP-208 |
Commissioning procedure for SPS injection tests with new MDSH functionality | sps | |
MPP-203 |
SPS dI/dt: Status and interlocking strategy | spssps-didt |
2020¶
2018¶
2016¶
2015¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-104 |
SPS East Extraction bump inhibit during COLDEX operation | sps |
2014¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-95 |
SPS commissioning of BIS inputs / regularily exercising all unused BIS inputs. | sps |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-73 |
Issue with beam transfer between SPS and LHC | sps | |
MPP-72 |
Q20 TCDI settings | sps | |
MPP-68 |
SPS: Fast extraction from LSS2, using the injection kickers in LSS1 - MD Results | sps | |
MPP-65 |
Issue with timing synchronization SPS/LHC – TDI impact | spslhc-injection |
2008¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-4 |
SPS interlock modifications for 2009 | sps | |
MPWG | Machine Protection Experience and Issues at the SPS in 2007 | sps |
2007¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | SPS Extraction Interlocks | sps |
2006¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Extraction studies for CNGS | sps | |
MPWG | Machine protection for CNGS : commissioning and operation | sps |
2005¶
2004¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | The TT40 beam accident on 25th October 2004 | sps |
2003¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | SPS extraction interlocks : the TED dump case | sps | |
MPWG | SPS interlocks for LHC extraction | sps |
2002¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Status of the new SPS hardware interlocks | sps | |
MPWG | Reliability assessment of the SPS access system | sps |