Past topics¶
2024¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-246 |
Readiness for first Stable Beams (A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, F. Van Der Veken, G. Pigny, I. Romera Ramirez, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil) |
stable-beams-readiness | |
MPP-244 |
Readiness for first beam (A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, G. Pigny, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil) |
stable-beams-readiness |
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-234 |
ALFA/AFP | stable-beams-readiness | |
MPP-234 |
ADT (D. Valuch) |
stable-beams-readiness | |
MPP-234 |
Collimation | stable-beams-readiness | |
MPP-234 |
Injection & LBDS (Y. Dutheil) |
stable-beams-readiness | |
MPP-234 |
Beam Loss Monitor system | stable-beams-readiness | |
MPP-234 |
BIC, PIC, WIC, FMCM, SMP | stable-beams-readiness | |
MPP-234 |
Vacuum System | stable-beams-readiness | |
MPP-234 |
TOTEM/CT-PPS | stable-beams-readiness | |
MPP-234 |
SIS (J. Wenninger) |
stable-beams-readiness |
2022¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-226 |
Readiness of Machine Protection and related systems for a full machine at injection (scrubbing) and things open before taking a 12 bunch train up to top energy. | stable-beams-readiness | |
MPP-223 |
Status of MP system commissioning before first beam | stable-beams-readiness |
2021¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-214 |
Status MP system commissioning before first injection of a nominal bunch | stable-beams-readiness | |
MPP-210 |
Machine protection requirements for the pilot beam test | stable-beams-readiness |