Action ID Done Deadline Meeting Description Responsible
193 MPP-231 Draft ECR on the proposed DC-BCT and SMP changes for the SPS LHC
  • T. Levens
  • R. Secondo
180 MPP-229 By the end of the year inputs for potential additional interlocks or hardware stops for the protections of components in the FRAS must be provided by the relevant teams and collected for the FRAS specifications LHC
  • F.-X. Nury
179 MPP-229 Prepare detailed specifications for the interlocks, including the FRAS key in CCR and the newly discussed “FRAS powering interlock” to a maskable input of the CIBUs in IR1 and 5 LHC
  • FRAS
  • MPP
182 MPP-226 Follow-up on the RBAC protection of the settings of machine protection equipment LHC
  • MPP
185 MPP-224 Install a BLM close to the BSRTMB in IR4 during the YETS LHC
  • B. Salvachua
183 MPP-224 Define and organize a test with beam to confirm that the beam is not affected in case of an abort of the wire power converter during the timeframe of the interlock reaction time of the WIC and BIS LHC
  • BE-OP
  • BE-ABP
187 MPP-223 Follow-up on the protection of settings for the SPS MKE phasing and discuss the potential impact of rolling back with LSA tags on other critical settings LHC
  • MPP
  • BE-OP
192 MPP-222 Check the aperture limits of the new BSRTM device are in accordance with Run3 parameters LHC
  • D. Mirarchi
  • R. De Maria
177 MPP-220 Analyze the changes to be made in the test procedure and study the consequences LHC
  • L. Roy
  • MPP
176 MPP-220 Provide the list of disabled BIS channels to the MPP and inform the MPP once the channels are enabled again LHC
  • C. Martin
175 MPP-220 Implement the publication through FESA of the additional signals (threshold values and measured value) and update the EDMS document LHC
  • M. Di Castro
172 MPP-218 Review the inconsistency that the WIC will not interlock the beam in case of a power converter failure, but still interlock the beam in case of a magnet failure PSB
  • G.P. Di Giovanni
  • MPP
  • D. Nisbet
154 MPP-217 Update SMP procedure and add that the BPF checks after each injection are done implicitly by the BIS LHC
  • R. Secondo
153 MPP-217 Include BPF tests in the SMP IPOC procedure LHC
  • R. Secondo
161 MPP-214 Update the BLM machine protection commissioning procedure with tests to ensure that the “beam info” bypass devices are removed prior to operation LHC
  • B. Salvachua
  • C. Zamantzas
166 MPP-213 Study necessity and feasibility of special interlock configuration for LINAC4 3 MeV runs Linac4
  • P. Skowronski
165 MPP-213 Initiate study of alternative interlock configuration and failure diagnostics for Linac4 and possibly other injectors Linac4
  • P. Skowronski
163 MPP-213 Update BIS specification (page 2) clarifying present and future situation wrt RF actuator Linac4PSB
  • C. Martin
170 MPP-211 Implement the proposed operational limits for the ADT excitation LHC
  • D. Valuch
167 MPP-211 Propose a proper timeline for a possible replacement scenario LHC
  • F. Sanders
149 MPP-209 Discuss the handling of the redundant energy and beta* limits and propose possible improvements LHC
  • COLLIMATION
  • BE-OP
174 MPP-208 Draft a procedure for the tracking of the bypassed equipment PSB
  • J. Uythoven
173 MPP-208 Organize a meeting between OP and the MPE SW team to define the specifications for an improved GUI PSB
  • B. Mikulec
145 MPP-207 Decide if a filter on the signal of the BLMs behind the dumps is needed to avoid saturation LHC
  • C. Wiesner
  • A. Lechner
  • Y. Dutheil
144 MPP-207 Evaluate feasibility of porting UFO Buster data acquisition from SDDS files to Post Mortem LHC
  • A. Lechner
  • J.C. Garnier
  • C. Zamantzas
142 MPP-207 Evaluate feasibility of implementing interlock based on the correct transfer line optics ID generated by SIS LHC
  • J. Wenninger
141 MPP-207 Check if the Beta* and energy gap interlock functionality is implemented in the TCDIs LHC
  • Y. Dutheil
140 MPP-207 Check if energy extraction switches opening signal sent from SIS is correctly received by the CIRCUIT SCADA LHC
  • J. Wenninger
  • A. Antoine
139 MPP-206 Add commissioning of blindable BLMs to the injection procedure LHC
  • Y. Dutheil
121 MPP-201 Implement additional software threshold for maximum losses during the slow extraction SPS
  • M. Fraser
  • V. Kain
118 MPP-201 Prepare and organize review of the SPS slow extraction system SPS
  • MPP, in collaboration with TE-ABT and BE-OP
117 MPP-200 Propose how to protect the CTRB interface of the BLMs to the timing system against accidental changes and overwriting via FESA, in collaboration with the timing team Linac4PSBPS
  • S. Jackson
  • J. Uythoven
132 MPP-198 LHCb velo motion system: Implement signal from limit switches to the VSS LHC
  • X. Pons
131 MPP-198 LHCb velo motion system: Prepare a detailed procedure for manual movement and perform the procedure in full when the detector is installed with active control system to monitor the movement and avoid damage to the limit switches LHC
  • F. Sanders
  • V. Coco
130 MPP-198 LHCb velo motion system: Evaluate if a warning could be produced if the VELO alignment algorithm attempts to move one side beyond the 0 mm point LHC
  • V. Coco
129 MPP-198 LHCb velo motion system: Prepare a specifications document for the motion control, failures and interlocks LHC
  • X. Pons
115 MPP-197 Organize a discussion on the BIS GUI for the injectors PSB
  • J. Uythoven
113 MPP-197 Verify how the connection has been done between POPS-B and BIS and describe the user input to BIS PSB
  • F. Boattini
112 MPP-196 Verify the maximum allowed XRP temperature with TE-VSC, taking into account outgassing and the temperature of the ferrites LHC
  • M. Trzebinski
111 MPP-195 Study the option of using the space in UJ76 during Run III LHC
  • M. Gasior
  • T. Levens
110 MPP-195 Determine a strategy for P8 LHC
  • COLLIMATION
  • R. Bruce
109 MPP-195 Circulate a list of expected redundancies for run III LHC
  • COLLIMATION
  • R. Bruce
108 MPP-195 Check orbit at the crystal during injection failure LHC
  • COLLIMATION
107 MPP-195 Produce detailed operational scenarios and required validation for the use of the crystals LHC
  • COLLIMATION
106 MPP-195 Produce commissioning procedure for the crystals LHC
  • COLLIMATION
104 MPP-193 Evaluate the potential gain and feasibility of evaluating the beam orbit at the collimator BPMs before starting the ramp-up of the BBLR wire current and issuing a warning if required LHC
  • G. Sterbini
  • S. Radaelli
  • J. Wenninger
97 MPP-193 Reassess the temperature load on the BPMs in both TCSP jaws in case of an asynchronous beam dump considering the worst-case (type 2) erratic LHC
  • F. Carra
  • A. Lechner
96 MPP-193 Update expected energy deposition based on the newest FLUKA studies for the case of an asynchronous beam dump and an injection error for the relevant collimator materials LHC
  • F. Carra
  • A. Lechner
64 MPP-192 Report on the first operational experience of the SPS BLM system after LS2 SPS
  • K. Li
63 MPP-191 IQC application and future development: Add an update of the IQC settings for abort gap keeper settings changes LHC
  • TE-ABT
  • BE-OP
62 MPP-191 IQC application and future development: Discuss the use cases and give inputs for the FESA/firmware preparation for the new dBLM readout electronics LHC
  • J. Wenninger
  • E. Calvo
61 MPP-191 iBPMs layout in Run3: Propose criteria for iBPM validation before switching to the new system (performance / specifications / reliability criteria) LHC
  • A. Boccardi
60 MPP-191 iBPMs layout in Run3: Discussion on iBPM firmware and possible failure cases LHC
  • A. Boccardi
59 MPP-191 AC-dipole operation with three bunches: Check the interlocking with triplet BLM for 1 pilot and for 3 pilots LHC
  • OMC
  • L. Malina
  • R. Tomas
  • COLLIMATION
85 MPP-190 Study how to implement an online optics model and related configuration management depending on the optics Linac4
  • B. Mikulec
  • R. Scrivens
56 MPP-187 Study the effect of the modified MKB waveforms on the flashover failure scenario LHC
  • Y. Dutheil
  • TE-ABT
  • A. Lechner
  • EN-STI
55 MPP-187 Based on first operational experience after LS2, review the steering procedure and evaluate the possibility of steering with full trains LHC
  • C. Bracco
  • TE-ABT
54 MPP-187 Investigate the implementation of a SIS based interlock of the integrated intensity of consecutive bunches. Define the maximum number of bunches that have to be taken into account for averaging the bunch intensity LHC
  • MPP
  • J. Wenninger
  • BE-OP
94 MPP-186 Evaluate if automatic checks of the internal performance of the SPS BIS systems are required SPS
  • J. Uythoven
89 MPP-186 Update specifications for the SPS and TT10 WIC with the modified MDSH connections SPS
  • R. Mompo
53 MPP-185 Analyse if a limit in the number of consecutive dumps or a minimum time between the dumps is required for Run3 operation LHC
  • M. Calviani
  • EN-STI
  • C. Bracco
  • TE-ABT
83 MPP-182 Define procedure under which circumstances and how to change the high-loss LINAC4 watchdog limits, including roll back to standard operation Linac4
  • A. Lombardi
80 MPP-182 Investigate and if possible implement the link between BIS and External Conditions. Otherwise, implement link via SIS Linac4
  • G. Kruk
  • B. Mikulec
128 MPP-179 Evaluate how the masking of watchdog interlocks in the SIS can be only allowed for short pulse lengths Linac4
  • B. Mikulec
74 MPP-179 Identify relevant locations and beam parameters for energy-deposition studies at LINAC4 Linac4
  • A. Lombardi
  • A. Lechner
  • B. Mikulec
73 MPP-179 Propose values for BLM hardware settings PSB
  • B. Mikulec
72 MPP-179 Evaluate if there are additional aperture bottlenecks, where damage might lead to longer downtime than required for a bellow replacement Linac4
  • A. Lombardi
71 MPP-179 Evaluate best implementation to send automatic reminders of all active SIS masks for every shift PSB
  • B. Mikulec
34 MPP-169 Test steps of the emergency dump procedure related to the LBDS after TS2 LHC
  • M. Solfaroli
  • N. Magnin
33 MPP-169 Request functionality to open up excitation window of ADT and prepare OP sequence for scraping the full LHC beam LHC
  • D. Valuch
  • MPP
22 MPP-151 Summarize planned changes in the BLMs around the TDEs in an ECR LHC
  • TE-ABT
  • BE-BI
19 MPP-149 Review other failure cases for RD1 and estimate the associated FMCM signals LHC
  • TE-MPE-PE
18 MPP-146 Study the feasibility of a variable window for PC interlocking LHC
  • TE-EPC
16 MPP-143 BLM inhibit in case of too high transverse losses with injection: propose commissioning test to verify functionality LHC
  • BE-BI
  • TE-ABT
13 MPP-137 Organise a circulating checklist with points to be followed up between the CC team and MPP; iterate during a coffee discussion early January LHC
  • CC team
  • MPP
9 MPP-124 Confirm number of extra bunches the IP7 collimators can take during a type 2 erratic and if this causes a problem LHC
  • R. Bruce
1 MPP-92 Review protection limit of inner triplet (80K) with realistic impact distributions LHC
  • COLLIMATION
  • MPP
20 special-mpp Investigate whether it is needed to implement a smoother change of the tolerance during squeeze instead of going from 4 to 1 sigmas at the end LHC
  • BE-OP
  • COLLIMATION