BIM detector interlocking
Topic information
- Category
-
- Deadline
- Speakers
- Luigi Salvatore Esposito
- Machines
Topic details
Information from Luigi:
ECR for the BIM installation at the SPS: https://edms.cern.ch/document/2606410/0.1
As mentioned, the devices will be used during MD test (they might become operational in a second moment).
Could be scheduled together with LSS4 crystal.